The ALBYR Structures team was commissioned to design a new industrial hall in a high seismic activity region. The hall includes seven interior double-hinged frames with tapered beam ends as well as floor levels for offices. The columns were designed to support crane girders for a 5.5-ton crane.
In May 2018, there was completed new production of the renowned Scottish whisky producer Macallan after three years of construction. The company building has a spectacular roof structure which fits perfectly into the surrounding landscape. The green roof spans over a length of more than 656 ft. It consists of five domes with tapered off canopy.